Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,193
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0195 # 01 Y:2001 | 01 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,400 | $3,150 | Not Implemented |
UM0195 # 02 Y:2001 | 02 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $329 | $500 | Implemented |
UM0195 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $755 | $1,000 | Not Implemented |
UM0195 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,182 | $375 | Implemented |
UM0195 # 05 Y:2001 | 05 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $551 | $500 | Not Implemented |
UM0195 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $1,052 | Not Implemented |
UM0193 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,099 | $12,877 | Not Implemented |
UM0193 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,550 | $3,000 | Implemented |
UM0193 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $675 | Implemented |
UM0193 # 04 Y:2001 | 04 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,365 | $1,000 | Implemented |
UM0193 # 05 Y:2001 | 05 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $487 | $1,000 | Not Implemented |
UM0193 # 06 Y:2001 | 06 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $341 | $200 | Implemented |
UM0193 # 07 Y:2001 | 07 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $942 | $4,500 | Not Implemented |
UM0193 # 08 Y:2001 | 08 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,160 | $2,060 | Not Implemented |
UM0193 # 09 Y:2001 | 09 | 2001 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $9,870 | $11,000 | Not Implemented |
UM0193 # 10 Y:2001 | 10 | 2001 | REDESIGN PROCESS | $40,150 | $2,500 | Implemented |
UM0193 # 11 Y:2001 | 11 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $27,400 | $1,000 | Implemented |
UM0193 # 12 Y:2001 | 12 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $26,010 | $1,650 | Not Implemented |
UM0193 # 13 Y:2001 | 13 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $4,000 | $4,200 | Not Implemented |
UM0192 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $27,600 | $7,600 | Implemented |
UM0192 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,649 | $10,474 | Not Implemented |
UM0192 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,341 | $800 | Implemented |
UM0192 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,130 | $3,850 | Implemented |
UM0192 # 05 Y:2001 | 05 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $700 | $700 | Implemented |
UM0192 # 06 Y:2001 | 06 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $21,000 | $20,000 | Implemented |