IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0709 # 05 Y:2005 05 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000 $0 Not Implemented
OK0709 # 06 Y:2005 06 2005 INSTALL SET-BACK TIMERS $4,055 $2,205 Not Implemented
OK0709 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,077 $4,640 Not Implemented
OK0709 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $541 $3,034 Not Implemented
OK0709 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $824 $1,820 Not Implemented
OK0709 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127 $109 Not Implemented
OK0709 # 11 Y:2005 11 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $159 $1,000 Not Implemented
OK0709 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $696 $4,181 Not Implemented
MS0275 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,870 $34,746 Implemented
MS0275 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,066 $392 Implemented
MS0275 # 03 Y:2005 03 2005 USE SYNTHETIC LUBRICANT $7,356 $3,025 Implemented
MS0275 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,972 $15,438 Not Implemented
MS0275 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,020 $9,612 Implemented
MS0275 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,823 $2,271 Not Implemented
SU0214 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $0 Not Implemented
SU0214 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $0 Implemented
SU0214 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,637 $0 Implemented
SU0214 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,167 $595 Implemented
SU0214 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,070 $1,125 Implemented
SU0214 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,629 $1,881 Not Implemented
UD0720 # 01 Y:2005 01 2005 USE MINIMUM STEAM OPERATING PRESSURE $6,931 $0 Not Implemented
UD0720 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,769 $0 Implemented
UD0720 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $3,870 $6,000 Implemented
UD0720 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,757 $3,200 Implemented
UD0720 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,200 $225 Implemented