IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0484 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,136 $45,100 Implemented
SD0484 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,196 $1,300 Implemented
SD0484 # 04 Y:2014 04 2014 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $6,896 $400 Implemented
SD0484 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,758 $300 Implemented
SD0484 # 06 Y:2014 06 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,388 $4,600 Not Implemented
SD0484 # 07 Y:2014 07 2014 USE PHOTOCELL CONTROLS $1,281 $3,700 Implemented
SU0361 # 01 Y:2014 01 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,135 $0 Implemented
SU0361 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $376 $0 Not Implemented
SU0361 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,756 $1,527 Implemented
SU0361 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $3,508 $849 Implemented
SU0361 # 05 Y:2014 05 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,288 $2,716 Implemented
SU0361 # 06 Y:2014 06 2014 UPGRADE OBSOLETE EQUIPMENT $512 $1,800 Implemented
SU0361 # 07 Y:2014 07 2014 ELIMINATE/REDUCE AN OPERATION $8,503 $41,760 Not Implemented
SU0361 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,075 $35,370 Implemented
SF0447 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,814 $70 Not Implemented
SF0447 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,248 $0 Implemented
SF0447 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,366 $4,235 Implemented
SF0447 # 04 Y:2014 04 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $38,158 $105,000 Not Implemented
SF0447 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $2,240 $6,743 Not Implemented
SF0447 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,962 $93,924 Not Implemented
SF0447 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,341 $15,131 Not Implemented
SF0447 # 08 Y:2014 08 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $139,124 $745,024 Not Implemented
IP0024 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $16,250 $0 Implemented
IP0024 # 02 Y:2014 02 2014 APPLY FOR INVESTMENT INCENTIVES $2,460 $147 Implemented
IP0024 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,916 $284 Not Implemented