Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0142 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,769 | $9,000 | Not Implemented |
NC0142 # 05 Y:1998 | 05 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,977 | $1,448 | Not Implemented |
NC0142 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,279 | $31,754 | Implemented |
NC0142 # 07 Y:1998 | 07 | 1998 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,435 | $10 | Implemented |
NC0142 # 08 Y:1998 | 08 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $375 | $200 | Not Implemented |
NC0142 # 09 Y:1998 | 09 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $75 | $0 | Implemented |
OK0550 # 01 Y:1998 | 01 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $100,207 | $0 | Not Implemented |
OK0550 # 02 Y:1998 | 02 | 1998 | REDESIGN PROCESS | $26,768 | $20,000 | Not Implemented |
OK0550 # 03 Y:1998 | 03 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,393 | $1,945 | Implemented |
OK0550 # 04 Y:1998 | 04 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,343 | $4,000 | Implemented |
OK0550 # 05 Y:1998 | 05 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $18,120 | $0 | Implemented |
OK0550 # 06 Y:1998 | 06 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,888 | $9,700 | Not Implemented |
OK0550 # 07 Y:1998 | 07 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,071 | $8,400 | Implemented |
OK0550 # 08 Y:1998 | 08 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,920 | $3,006 | Not Implemented |
OK0550 # 09 Y:1998 | 09 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $518 | $1,610 | Not Implemented |
OK0550 # 10 Y:1998 | 10 | 1998 | INSULATE BARE EQUIPMENT | $197 | $134 | Implemented |
UM0124 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,424 | $1,183 | Implemented |
UM0124 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,856 | $10,304 | Implemented |
UM0124 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $426 | $1,000 | Not Implemented |
UM0124 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,583 | $3,500 | Not Implemented |
UM0124 # 05 Y:1998 | 05 | 1998 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $17,113 | $4,120 | Not Implemented |
UM0124 # 06 Y:1998 | 06 | 1998 | ELIMINATE/REDUCE AN OPERATION | $22,516 | $9,600 | Implemented |
UM0124 # 07 Y:1998 | 07 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $158,133 | $30,000 | Implemented |
WV0146 # 01 Y:1998 | 01 | 1998 | REDUCE VENTILATION AIR | $314 | $350 | Implemented |
WV0146 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $38 | $136 | Not Implemented |