IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0196 # 10 Y:2004 10 2004 CHANGE OPERATING CONDITIONS $18,766 $24,711 Not Implemented
SU0191 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,017 $0 Implemented
SU0191 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $328 Not Implemented
SU0191 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,058 $25,000 Implemented
SU0191 # 04 Y:2004 04 2004 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $19,254 $38,185 Not Implemented
SU0191 # 05 Y:2004 05 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,413 $2,856 Implemented
SU0191 # 06 Y:2004 06 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,000 $7,400 Not Implemented
UM0261 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $96,676 $11,096 Not Implemented
UM0261 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,377 $47,700 Not Implemented
UM0261 # 03 Y:2004 03 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,493 $2,000 Implemented
UM0261 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $6,503 $500 Implemented
UM0261 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,770 $1,711 Implemented
UM0261 # 06 Y:2004 06 2004 COVER OPEN TANKS $625 $300 Implemented
WI0473 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,462 $53,600 Implemented
WI0473 # 02 Y:2004 02 2004 REDUCE VENTILATION AIR $16,661 $32,000 Not Implemented
WI0473 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,156 $11,000 Not Implemented
WI0473 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $1,028 $100 Implemented
WI0473 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $619 $640 Implemented
SD0343 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,576 $440 Not Implemented
SD0343 # 02 Y:2004 02 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $15,314 $46,898 Not Implemented
SD0343 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,381 $2,113 Not Implemented
SD0343 # 04 Y:2004 04 2004 USE EVAPORATION TO CONCENTRATE MATERIAL $11,520 $12,000 Not Implemented
SD0343 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,692 $18,500 Not Implemented
SD0343 # 06 Y:2004 06 2004 INCREASE USE OF AUTOMATION $75,100 $65,000 Not Implemented
SD0343 # 07 Y:2004 07 2004 INCREASE USE OF AUTOMATION $38,050 $25,000 Not Implemented