IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0232 # 14 Y:2006 14 2006 INSTALL OCCUPANCY SENSORS $651 $2,039 Not Implemented
SU0232 # 15 Y:2006 15 2006 OPTIMIZE PLANT POWER FACTOR $1,024 $9,635 Not Implemented
OK0728 # 01 Y:2006 01 2006 REDUCE VENTILATION AIR $35,971 $12,184 Not Implemented
OK0728 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $75,048 $240,000 Not Implemented
OK0728 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,567 $34,652 Not Implemented
OK0728 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,034 $1,994 Not Implemented
OK0728 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $430 Not Implemented
OK0728 # 06 Y:2006 06 2006 AIR CONDITION ONLY SPACE NECESSARY $6,517 $2,295 Not Implemented
OK0728 # 07 Y:2006 07 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,500 $0 Not Implemented
BD0309 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $23,664 $27,472 Not Implemented
BD0309 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,400 $1,800 Implemented
BD0309 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,190 $0 Implemented
BD0309 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $809 $1,000 Implemented
BD0309 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,023 $1,880 Implemented
BD0309 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $653 $1,200 Implemented
BD0309 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $309 $475 Implemented
BD0309 # 08 Y:2006 08 2006 RECOVER AND REUSE COOLING WATER $25,524 $60,000 Not Implemented
BD0309 # 09 Y:2006 09 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $54,288 $17,200 Not Implemented
UD0740 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,164 $258,960 Not Implemented
UD0740 # 02 Y:2006 02 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $107,569 $256,000 Implemented
UD0740 # 03 Y:2006 03 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $56,879 $252,100 Implemented
UD0740 # 04 Y:2006 04 2006 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $45,101 $17,030 Not Implemented
UD0740 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $42,737 $0 Implemented
UD0740 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,847 $52,400 Not Implemented
UD0740 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,352 $2,280 Implemented