IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0634 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $6,380 Not Implemented
CO0634 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $2,690 Not Implemented
CO0634 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,630 $16,780 Not Implemented
CO0634 # 08 Y:2010 08 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,380 $14,690 Not Implemented
CO0634 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,460 $3,000 Not Implemented
CO0634 # 10 Y:2010 10 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $170 $590 Not Implemented
DL0052 # 01 Y:2010 01 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $143,000 $81,500 Not Implemented
DL0052 # 02 Y:2010 02 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $53,946 $10,848 Not Implemented
DL0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,100 $24,000 Not Implemented
DL0052 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,250 $9,000 Implemented
DL0052 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,940 $1,500 Implemented
DL0052 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,040 $720 Implemented
DL0052 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,560 $200 Implemented
DL0052 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $3,810 $560 Implemented
DL0052 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,650 $1,019 Implemented
DL0052 # 10 Y:2010 10 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,106 $495 Not Implemented
DL0052 # 11 Y:2010 11 2010 REDUCE VENTILATION AIR $310 $585 Not Implemented
MA0660 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,403 $9,546 Implemented
MA0660 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,241 $0 Not Implemented
MA0660 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $58,587 $0 Implemented
MA0660 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,601 $19,240 Not Implemented
MA0660 # 05 Y:2010 05 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $23,123 $0 Implemented
MA0659 # 01 Y:2010 01 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $35,538 $103,290 Implemented
MA0659 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,141 $119,100 Implemented
MA0659 # 03 Y:2010 03 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,648 $35,545 Not Implemented