IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0024 # 04 Y:2014 04 2014 OPTIMIZE PLANT POWER FACTOR $15,670 $13,000 Not Implemented
IP0024 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $542 $603 Not Implemented
IP0024 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $479 $1,050 Not Implemented
IP0024 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $281 $561 Not Implemented
UA0121 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,355 $300 Not Implemented
UA0121 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,866 $9,095 Implemented
UA0121 # 03 Y:2014 03 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $27,986 $37,058 Not Implemented
UA0121 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $942 $1,018 Not Implemented
UA0121 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,373 $30,376 Not Implemented
CO0685 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,910 $13,360 Implemented
CO0685 # 02 Y:2014 02 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,740 $4,240 Implemented
CO0685 # 03 Y:2014 03 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,750 $610 Implemented
CO0685 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,890 $8,590 Implemented
CO0685 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,210 $1,500 Implemented
OK0880 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $706 $689 Not Implemented
OK0880 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $463 Not Implemented
OK0880 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,983 $61,440 Implemented
OK0880 # 04 Y:2014 04 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,695 $8,800 Not Implemented
OK0880 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $10,569 $37,500 Not Implemented
OK0880 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $227 $798 Not Implemented
OK0880 # 07 Y:2014 07 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,087 $3,573 Not Implemented
OK0880 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $6,439 $6,993 Not Implemented
OK0880 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,385 $3,468 Not Implemented
OK0880 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $78 $376 Not Implemented
MA0729 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,490 $500 Implemented