IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0059 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $9,950 $0 Not Implemented
TA0059 # 02 Y:2003 02 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,536 $500 Not Implemented
TA0059 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $7,671 Implemented
TA0059 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,890 $200 Implemented
TA0059 # 05 Y:2003 05 2003 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,100 $585 Not Implemented
TA0059 # 06 Y:2003 06 2003 REPAIR FAULTY LOUVERS AND DAMPERS $2,040 $625 Not Implemented
LE0159 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,357 $1,000 Not Implemented
LE0159 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,138 $300 Implemented
LE0159 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,945 $0 Not Implemented
LE0159 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,620 $0 Implemented
LE0159 # 05 Y:2003 05 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,055 $13,500 Not Implemented
LE0159 # 06 Y:2003 06 2003 RECOVER AND REUSE COOLING WATER $1,286 $25,500 Not Implemented
LE0159 # 07 Y:2003 07 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $45,153 $100,000 Not Implemented
LE0159 # 08 Y:2003 08 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,548 $2,500 Not Implemented
LE0159 # 09 Y:2003 09 2003 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $8,620 $12,247 Not Implemented
LE0159 # 10 Y:2003 10 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,932 $37,964 Not Implemented
LL0166 # 01 Y:2003 01 2003 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $100,695 $120,000 Implemented
LL0166 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,855 $9,440 Implemented
LL0166 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $9,566 $3,733 Not Implemented
LL0166 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,286 $20 Not Implemented
LL0166 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,918 $492 Not Implemented
LL0166 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $967 $570 Not Implemented
LL0166 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $917 $572 Not Implemented
LL0166 # 08 Y:2003 08 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $55,292 $0 Implemented
IA0318 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $572 $69 Implemented