IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0740 # 08 Y:2006 08 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,428 $10,000 Not Implemented
UD0740 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,096 $0 Implemented
UD0740 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,805 $1,500 Implemented
UD0740 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,326 $1,700 Implemented
UD0740 # 12 Y:2006 12 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,280 $0 Implemented
UD0740 # 13 Y:2006 13 2006 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $223 $0 Implemented
AM0509 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $2,080 $3,690 Implemented
AM0509 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $1,650 $250 Implemented
AM0509 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,010 $913 Implemented
AM0509 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $250 Implemented
AM0509 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $440 $0 Implemented
AS0421 # 01 Y:2006 01 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $79,716 $39,658 n/a
AS0421 # 02 Y:2006 02 2006 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,068 $1,500 n/a
AS0421 # 03 Y:2006 03 2006 INSTALL EFFICIENT RECTIFIERS $576 $15,000 n/a
BD0308 # 01 Y:2006 01 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $55,089 $7,500 Implemented
BD0308 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,718 $15,000 Implemented
BD0308 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $47,488 $24,000 Implemented
BD0308 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,806 $30,100 Implemented
BD0308 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,996 $1,500 Implemented
BD0308 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,394 $1,275 Implemented
BD0308 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $161 $160 Implemented
BD0308 # 08 Y:2006 08 2006 MINIMIZE WATER USAGE $254 $1,150 Implemented
OR0499 # 01 Y:2006 01 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $77,273 $12,000 Implemented
OR0499 # 02 Y:2006 02 2006 $30,000 $18,000 Implemented
OR0499 # 03 Y:2006 03 2006 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,200 $0 Implemented