IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0659 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,781 $7,735 Not Implemented
MA0659 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,273 $1,800 Implemented
OR0555 # 01 Y:2010 01 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $257,883 $405,450 Not Implemented
OR0555 # 02 Y:2010 02 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $32,115 $37,100 Not Implemented
OR0555 # 03 Y:2010 03 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,978 $11,900 Implemented
OR0555 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,054 $1 Implemented
NC0401 # 01 Y:2010 01 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,744 $3,600 Implemented
NC0401 # 02 Y:2010 02 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,833 $0 Implemented
NC0401 # 03 Y:2010 03 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,578 $0 Implemented
NC0401 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,940 $7,800 Implemented
NC0401 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $200 Implemented
NC0401 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,947 $6,200 Implemented
NC0401 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $5,761 $3,750 Implemented
NC0399 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,597 $100 Implemented
NC0399 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $200 Implemented
NC0399 # 03 Y:2010 03 2010 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $40,261 $0 Not Implemented
NC0399 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $1,429 $5,438 Implemented
NC0399 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $0 Implemented
NC0399 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $7,151 $23,576 Implemented
NC0399 # 07 Y:2010 07 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,943 $8,852 Not Implemented
NC0399 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $4,744 $1,550 Implemented
NC0399 # 09 Y:2010 09 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,805 $6,000 Implemented
NC0399 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $1,592 $2,600 Implemented
SD0426 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,373 $100 Implemented
SD0426 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,943 $1,000 Implemented