IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26,123

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0118 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $4,115 $3,020 Not Implemented
WM0118 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $5,010 Not Implemented
WM0118 # 09 Y:2018 09 2018 USE PHOTOCELL CONTROLS $2,253 $840 Not Implemented
WM0118 # 10 Y:2018 10 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,400 $2,776 Not Implemented
WM0118 # 11 Y:2018 11 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,207 $1,980 Not Implemented
WM0118 # 12 Y:2018 12 2018 INSTALL OCCUPANCY SENSORS $262 $262 Not Implemented
WM0118 # 13 Y:2018 13 2018 INSULATE BARE EQUIPMENT $255 $510 Not Implemented
WM0118 # 14 Y:2018 14 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $527 Not Implemented
OR0698 # 01 Y:2018 01 2018 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $32,214 $597 Not Implemented
OR0698 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,374 $9,440 Implemented
OR0698 # 03 Y:2018 03 2018 USE HEAT PUMP FOR SPACE CONDITIONING $12,461 $22,850 Implemented
OR0698 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,148 $325 Implemented
AM0745 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $45,900 $0 Not Implemented
AM0745 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,800 $44,650 Not Implemented
AM0745 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $19,915 $40,190 Not Implemented
AM0745 # 04 Y:2018 04 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,600 $2,320 Not Implemented
AM0745 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,730 $20 Not Implemented
AM0745 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,060 $500 Not Implemented
AM0745 # 07 Y:2018 07 2018 USE SYNTHETIC LUBRICANT $4,580 $0 Not Implemented
AM0745 # 08 Y:2018 08 2018 PAY UTILITY BILLS ON TIME $2,870 $0 Not Implemented
AM0745 # 09 Y:2018 09 2018 USE PHOTOCELL CONTROLS $2,000 $1,740 Not Implemented
WV0555 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,162 $53,700 Implemented
WV0555 # 02 Y:2018 02 2018 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,502 $18,000 Implemented
WV0555 # 03 Y:2018 03 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $6,339 $6,000 Not Implemented
WV0555 # 04 Y:2018 04 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $5,001 $25,000 Implemented