Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0143 # 02 Y:1999 | 02 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $461 | $0 | Not Implemented |
UM0143 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $198 | $500 | Implemented |
UM0143 # 04 Y:1999 | 04 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,836 | $200 | Not Implemented |
UM0143 # 05 Y:1999 | 05 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $762 | $200 | Not Implemented |
UM0143 # 06 Y:1999 | 06 | 1999 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $5,909 | $3,434 | Implemented |
UM0143 # 07 Y:1999 | 07 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $195,000 | $10,000 | Not Implemented |
WI0354 # 01 Y:1999 | 01 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $7,740 | $21,000 | Not Implemented |
WI0354 # 02 Y:1999 | 02 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,469 | $500 | Implemented |
WI0354 # 03 Y:1999 | 03 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,465 | $0 | Implemented |
WI0354 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,567 | $18,988 | Implemented |
WI0354 # 05 Y:1999 | 05 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $2,618 | $500 | Not Implemented |
WI0354 # 06 Y:1999 | 06 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $2,328 | $400 | Implemented |
WI0354 # 07 Y:1999 | 07 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,418 | $4,850 | Not Implemented |
WI0354 # 08 Y:1999 | 08 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,284 | $5,000 | Implemented |
WI0354 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $477 | $180 | Implemented |
WI0354 # 10 Y:1999 | 10 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $373 | $640 | Implemented |
WI0354 # 11 Y:1999 | 11 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $360 | $800 | Implemented |
NC0165 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,720 | $10,000 | Implemented |
NC0165 # 02 Y:1999 | 02 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,539 | $1,500 | Implemented |
NC0165 # 03 Y:1999 | 03 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $151,290 | $29,000 | Implemented |
NC0165 # 04 Y:1999 | 04 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $231,300 | $1,600,000 | Not Implemented |
NC0165 # 05 Y:1999 | 05 | 1999 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $824,740 | $836,000 | Implemented |
NC0166 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $756 | $1,500 | Implemented |
NC0166 # 02 Y:1999 | 02 | 1999 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,877 | $15,000 | Not Implemented |
NC0166 # 03 Y:1999 | 03 | 1999 | USE PHOTOCELL CONTROLS | $601 | $150 | Implemented |