IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0207 # 09 Y:2002 09 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,053 $0 Implemented
MS0208 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $2,668 $2,700 Not Implemented
MS0208 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $919 $591 Not Implemented
MS0208 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $244 $129 Implemented
MS0208 # 04 Y:2002 04 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $960 $0 Implemented
MS0208 # 05 Y:2002 05 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $905 $374 Not Implemented
MA0514 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $40,968 $200,000 Not Implemented
MA0514 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,996 $5,000 Not Implemented
MA0514 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,892 $0 Implemented
MA0514 # 04 Y:2002 04 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,569 $0 Implemented
MA0514 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,407 $0 Not Implemented
MA0514 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,214 $500 Implemented
MA0514 # 07 Y:2002 07 2002 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $519 $900 Not Implemented
MA0514 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $214 $262 Not Implemented
MA0514 # 09 Y:2002 09 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $177 $281 Implemented
MI0039 # 01 Y:2002 01 2002 MOVE PRODUCT USING MECHANICAL MEANS $115,650 $10,000 n/a
MI0039 # 02 Y:2002 02 2002 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $73,631 $42,600 n/a
MI0039 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,440 $3,600 n/a
MI0039 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,734 $1,300 n/a
MI0039 # 05 Y:2002 05 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,717 $7 n/a
BD0211 # 01 Y:2002 01 2002 USE RADIANT HEATER FOR SPOT HEATING $20,195 $31,000 Implemented
BD0211 # 02 Y:2002 02 2002 INSTALL AUTOMATIC STACK DAMPER $7,722 $5,000 Not Implemented
BD0211 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,837 $900 Implemented
BD0211 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,754 $1,000 Not Implemented
BD0211 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,288 $900 Implemented