Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0635 # 08 Y:2008 | 08 | 2008 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,508 | $12,000 | Not Implemented |
MA0635 # 09 Y:2008 | 09 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,255 | $5,700 | Not Implemented |
MA0635 # 10 Y:2008 | 10 | 2008 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,859 | $1,200 | Not Implemented |
MA0635 # 11 Y:2008 | 11 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,035 | $1,600 | Not Implemented |
MA0635 # 12 Y:2008 | 12 | 2008 | USE MINIMUM SAFE OVEN VENTILATION | $880 | $500 | Implemented |
NC0375 # 01 Y:2008 | 01 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,790 | $7,000 | Not Implemented |
NC0375 # 02 Y:2008 | 02 | 2008 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $15,885 | $41,750 | Not Implemented |
NC0375 # 03 Y:2008 | 03 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,903 | $7,500 | Implemented |
NC0375 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,473 | $1,680 | Implemented |
NC0375 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,999 | $4,820 | Implemented |
NC0375 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,686 | $2,173 | Implemented |
NC0374 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $32,923 | $63,000 | Implemented |
NC0374 # 02 Y:2008 | 02 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,372 | $18,000 | Implemented |
NC0374 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,977 | $100 | Implemented |
NC0374 # 04 Y:2008 | 04 | 2008 | REDESIGN PROCESS | $11,653 | $22,000 | Not Implemented |
NC0374 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,040 | $7,000 | Implemented |
NC0374 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,915 | $100,000 | Implemented |
MA0634 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,014 | $119,495 | Implemented |
MA0634 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,407 | $20,000 | Not Implemented |
MA0634 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,058 | $3,000 | Not Implemented |
MA0634 # 04 Y:2008 | 04 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,932 | $2,500 | Implemented |
MA0634 # 05 Y:2008 | 05 | 2008 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,034 | $6,000 | Not Implemented |
MA0634 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $498 | $500 | Implemented |
SF0362 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $2,736 | $684 | Implemented |
SF0362 # 02 Y:2008 | 02 | 2008 | COVER OPEN TANKS | $19,051 | $2,966 | Not Implemented |