Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0444 # 03 Y:2014 | 03 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,306 | $80,000 | Not Implemented |
UM0444 # 04 Y:2014 | 04 | 2014 | USE MINIMUM STEAM OPERATING PRESSURE | $6,638 | $5,000 | Implemented |
UM0444 # 05 Y:2014 | 05 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $104,300 | $208,000 | Not Implemented |
UA0120 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,756 | $800 | Not Implemented |
UA0120 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,394 | $5,695 | Implemented |
UA0120 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $4,402 | $160 | Not Implemented |
UA0120 # 05 Y:2014 | 05 | 2014 | MODIFY STARTUP/SHUTDOWN TIMES | $3,313 | $0 | Not Implemented |
TT0127 # 01 Y:2014 | 01 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $34,016 | $68,097 | Not Implemented |
TT0127 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,188 | $228,000 | Not Implemented |
TT0127 # 03 Y:2014 | 03 | 2014 | INSTALL COMMON HEADER ON COMPRESSORS | $5,171 | $25 | Not Implemented |
TT0127 # 04 Y:2014 | 04 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $600 | $25 | Implemented |
TT0127 # 05 Y:2014 | 05 | 2014 | DISCONNECT BALLASTS | $390 | $130 | Implemented |
NC0510 # 01 Y:2014 | 01 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $55,430 | $1,200 | Implemented |
NC0510 # 02 Y:2014 | 02 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $5,472 | $4,800 | Not Implemented |
NC0510 # 03 Y:2014 | 03 | 2014 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $1,500 | $1,000 | Implemented |
NC0510 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $39,042 | $3,000 | Not Implemented |
NC0510 # 05 Y:2014 | 05 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $26,718 | $67,500 | Implemented |
NC0510 # 06 Y:2014 | 06 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,896 | $1,750 | Not Implemented |
NC0510 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,422 | $100 | Implemented |
NC0510 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $1,444 | $2,082 | Implemented |
NC0510 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $943 | $1,993 | Implemented |
NC0510 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $811 | $3,523 | Implemented |
NC0510 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $836 | $240 | Implemented |
NC0510 # 12 Y:2014 | 12 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $533 | $286 | Not Implemented |
NC0510 # 13 Y:2014 | 13 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,594 | $4,256 | Not Implemented |