IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0099 # 01 Y:1997 01 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $389 $750 Not Implemented
DS0099 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,032 $135 Implemented
DS0099 # 03 Y:1997 03 1997 INSTALL SET-BACK TIMERS $7,453 $4,500 Implemented
DS0099 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,231 $700 Implemented
DS0099 # 05 Y:1997 05 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $5,810 $3,267 Implemented
DS0099 # 06 Y:1997 06 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $3,585 $6,840 Not Implemented
ME0224 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,583 $18,145 Implemented
ME0224 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,674 $5,557 Implemented
ME0224 # 03 Y:1997 03 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,198 $1,666 Not Implemented
ME0224 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,967 $650 Not Implemented
ME0224 # 05 Y:1997 05 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $3,067 $279 Implemented
ME0224 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $965 $250 Implemented
ME0224 # 07 Y:1997 07 1997 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $3,640 $5,000 Implemented
ME0224 # 08 Y:1997 08 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,760 $0 Implemented
ME0224 # 09 Y:1997 09 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $214 $1,850 Implemented
MA0395 # 01 Y:1997 01 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,941 $16,900 Not Implemented
MA0395 # 02 Y:1997 02 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $440 $0 Not Implemented
MA0395 # 03 Y:1997 03 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $20 $0 Implemented
MA0395 # 04 Y:1997 04 1997 PAY BILLS ON TIME TO AVOID LATE FEES $1,153 $0 Implemented
MA0395 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $888 $992 Implemented
MA0395 # 06 Y:1997 06 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $825 $5,200 Not Implemented
MS0090 # 01 Y:1997 01 1997 INSTALL TIMERS AND/OR THERMOSTATS $4,329 $5,125 Implemented
MS0090 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,624 $8,079 Implemented
MS0090 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $292 $577 Not Implemented
MS0090 # 04 Y:1997 04 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,931 $2,350 Not Implemented