IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0259 # 09 Y:2003 09 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,286 $10,000 Not Implemented
NC0259 # 10 Y:2003 10 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,785 $12,240 Implemented
NC0259 # 11 Y:2003 11 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $3,651 $38,000 Not Implemented
WV0267 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,580 $0 Not Implemented
WV0267 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,522 $2,820 Not Implemented
WV0267 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $582 $150 Implemented
WV0267 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,402 $30 Implemented
WV0267 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,185 $135 Implemented
WV0267 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $353 $395 Implemented
WV0267 # 07 Y:2003 07 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,920 $1,125 Implemented
WV0267 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,946 $0 Implemented
WV0267 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $3,148 $1,475 Implemented
WV0267 # 10 Y:2003 10 2003 OPTIMIZE PLANT POWER FACTOR $2,644 $12,320 Not Implemented
WV0267 # 11 Y:2003 11 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $684 $250 Implemented
WV0267 # 12 Y:2003 12 2003 MINIMIZE WATER USAGE $6,675 $4,000 Implemented
GT0758 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,720 $47,268 Implemented
GT0758 # 02 Y:2003 02 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,072 $12,000 Implemented
GT0758 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,895 $47,736 n/a
GT0758 # 04 Y:2003 04 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,438 $31,350 n/a
GT0758 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $322 $0 Implemented
GT0758 # 06 Y:2003 06 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $28,386 $12,140 n/a
GT0758 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,773 $6,150 Not Implemented
GT0758 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $23,420 $1,850 Implemented
LE0158 # 01 Y:2003 01 2003 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $15,242 $0 Implemented
LE0158 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,841 $6,250 Not Implemented