IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0729 # 01 Y:2017 01 2017 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $6,900 $0 Implemented
AM0729 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,965 $28,840 Implemented
AM0729 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $3,490 $3,740 Implemented
AM0729 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,930 $1,000 Implemented
AM0729 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $3,770 $1,000 Not Implemented
AM0729 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $580 $220 Implemented
BS0095 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $9,634 $1,202 Implemented
BS0095 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,164 $45,960 Not Implemented
BS0095 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,935 $15,234 Not Implemented
BS0095 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $9,156 $20,491 Not Implemented
BS0095 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,362 $1,171 Not Implemented
BS0095 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,327 $128 Implemented
BS0095 # 07 Y:2017 07 2017 UPGRADE CONTROLS ON COMPRESSORS $9,891 $13,498 Not Implemented
BS0095 # 08 Y:2017 08 2017 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $10,520 $21,040 Not Implemented
BS0094 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,740 $120 Implemented
BS0094 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,969 $390 Not Implemented
BS0094 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,142 $30,425 Implemented
SD0545 # 01 Y:2017 01 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $14,252 $40,625 Not Implemented
SD0545 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,279 $33,276 Implemented
SD0545 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,972 $8,850 Not Implemented
SD0545 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $3,536 $6,060 Implemented
SD0545 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $954 $449 Implemented
SD0545 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $545 $914 Implemented
DL0174 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,170 $4,000 Not Implemented
DL0174 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,710 $18,000 Not Implemented