Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1901 # 11 Y:2019 | 11 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $754 | $280 | Implemented |
UK1901 # 12 Y:2019 | 12 | 2019 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $467 | $360 | Not Implemented |
UK1901 # 13 Y:2019 | 13 | 2019 | COVER OPEN TANKS | $4,132 | $156 | Not Implemented |
UK1901 # 14 Y:2019 | 14 | 2019 | INSULATE BARE EQUIPMENT | $110 | $270 | Not Implemented |
UK1901 # 15 Y:2019 | 15 | 2019 | COVER OPEN TANKS | $6,024 | $5,000 | Not Implemented |
UK1901 # 16 Y:2019 | 16 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,281 | $1,000 | Implemented |
OR0717 # 01 Y:2019 | 01 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,163 | $0 | Implemented |
OR0717 # 02 Y:2019 | 02 | 2019 | MINIMIZE WATER USAGE | $20,973 | $587 | Not Implemented |
OR0717 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,061 | $7,650 | Not Implemented |
OR0717 # 04 Y:2019 | 04 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,624 | $3,273 | Not Implemented |
OR0717 # 05 Y:2019 | 05 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $204,215 | $143,400 | Not Implemented |
LE0470 # 01 Y:2019 | 01 | 2019 | PAY UTILITY BILLS ON TIME | $4,000 | $0 | Not Implemented |
LE0470 # 02 Y:2019 | 02 | 2019 | USE AUTOMATIC FLOW CONTROL | $20,000 | $6,500 | Not Implemented |
LE0470 # 03 Y:2019 | 03 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $25,833 | $35,000 | Not Implemented |
LE0470 # 04 Y:2019 | 04 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,332 | $25,000 | Not Implemented |
LE0470 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,769 | $115,000 | Not Implemented |
LE0470 # 06 Y:2019 | 06 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $268,493 | $1,534,575 | Not Implemented |
OK1006 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $3,856 | $17,056 | Implemented |
OK1006 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,072 | $9,350 | Implemented |
OK1006 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,709 | $2,600 | Not Implemented |
OK1006 # 04 Y:2019 | 04 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $262 | $1,320 | Not Implemented |
OK1006 # 05 Y:2019 | 05 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $392 | $155 | Implemented |
OK1006 # 06 Y:2019 | 06 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $341 | $0 | Implemented |
IP0115 # 01 Y:2019 | 01 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,898 | $1,950 | Implemented |
IP0115 # 02 Y:2019 | 02 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $188 | $500 | Implemented |