IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1901 # 11 Y:2019 11 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $280 Implemented
UK1901 # 12 Y:2019 12 2019 ELIMINATE LEAKS IN WATER LINES AND VALVES $467 $360 Not Implemented
UK1901 # 13 Y:2019 13 2019 COVER OPEN TANKS $4,132 $156 Not Implemented
UK1901 # 14 Y:2019 14 2019 INSULATE BARE EQUIPMENT $110 $270 Not Implemented
UK1901 # 15 Y:2019 15 2019 COVER OPEN TANKS $6,024 $5,000 Not Implemented
UK1901 # 16 Y:2019 16 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,281 $1,000 Implemented
OR0717 # 01 Y:2019 01 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,163 $0 Implemented
OR0717 # 02 Y:2019 02 2019 MINIMIZE WATER USAGE $20,973 $587 Not Implemented
OR0717 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,061 $7,650 Not Implemented
OR0717 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,624 $3,273 Not Implemented
OR0717 # 05 Y:2019 05 2019 RECOVER AND REUSE WASTE MATERIAL $204,215 $143,400 Not Implemented
LE0470 # 01 Y:2019 01 2019 PAY UTILITY BILLS ON TIME $4,000 $0 Not Implemented
LE0470 # 02 Y:2019 02 2019 USE AUTOMATIC FLOW CONTROL $20,000 $6,500 Not Implemented
LE0470 # 03 Y:2019 03 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $25,833 $35,000 Not Implemented
LE0470 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,332 $25,000 Not Implemented
LE0470 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,769 $115,000 Not Implemented
LE0470 # 06 Y:2019 06 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $268,493 $1,534,575 Not Implemented
OK1006 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $3,856 $17,056 Implemented
OK1006 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,072 $9,350 Implemented
OK1006 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,709 $2,600 Not Implemented
OK1006 # 04 Y:2019 04 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $262 $1,320 Not Implemented
OK1006 # 05 Y:2019 05 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $392 $155 Implemented
OK1006 # 06 Y:2019 06 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $341 $0 Implemented
IP0115 # 01 Y:2019 01 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,898 $1,950 Implemented
IP0115 # 02 Y:2019 02 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $188 $500 Implemented