IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0463 # 13 Y:2015 13 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $229 $694 Not Implemented
SF0463 # 14 Y:2015 14 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,312 $26,140 Not Implemented
SF0463 # 15 Y:2015 15 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,394 $16,788 Implemented
SF0462 # 01 Y:2015 01 2015 REPAIR AND ELIMINATE STEAM LEAKS $3,033 $0 Implemented
SF0462 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,285 $0 Implemented
SF0462 # 03 Y:2015 03 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,475 $793 Implemented
SF0462 # 04 Y:2015 04 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,104 $1,941 Implemented
SF0462 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,415 $12,500 Not Implemented
SF0462 # 06 Y:2015 06 2015 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $601 $1,000 Not Implemented
SF0462 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,234 $4,284 Implemented
SF0462 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,459 $24,914 Implemented
SF0462 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,227 $11,712 Not Implemented
SD0496 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $43,186 $113,400 Implemented
SD0496 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $10,851 $12,449 Implemented
SD0496 # 03 Y:2015 03 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,239 $7,006 Implemented
SD0496 # 04 Y:2015 04 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,546 $18,500 Not Implemented
SD0496 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $2,674 $2,420 Implemented
SD0496 # 06 Y:2015 06 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $869 $1,356 Implemented
SF0461 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,239 $75 Implemented
SF0461 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,905 $3,053 Implemented
SF0461 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $2,517 $4,371 Implemented
SF0461 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,570 $7,605 Implemented
SF0461 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,819 $80,476 Implemented
SF0461 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $231 $1,000 Not Implemented
SF0461 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $424 $2,004 Not Implemented