IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0111 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19 $2,074 Not Implemented
WI0111 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $91 $233 Not Implemented
WI0111 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,325 $3,660 Not Implemented
OR0109 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $1,432 $1,506 Not Implemented
OR0109 # 02 Y:1991 02 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,381 $1,831 Not Implemented
OR0109 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $2,806 $3,900 Not Implemented
OR0109 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $165 $331 Not Implemented
OR0110 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $102 $51 Implemented
OR0110 # 02 Y:1991 02 1991 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $1,988 $0 Implemented
OR0110 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $323 $0 Implemented
OR0110 # 04 Y:1991 04 1991 MINIMIZE WATER USAGE $370 $0 Implemented
OR0110 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62 $150 Implemented
OR0110 # 06 Y:1991 06 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,069 $1,500 Implemented
RU0108 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $687 $5,000 Implemented
RU0108 # 02 Y:1991 02 1991 IMPROVE LUBRICATION PRACTICES $389 $800 Implemented
RU0108 # 03 Y:1991 03 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $60,583 $122,000 Implemented
RU0108 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,826 $4,450 Implemented
RU0108 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $140 Implemented
RU0108 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $722 $200 Implemented
AS0020 # 01 Y:1991 01 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $420,880 $0 Not Implemented
AS0020 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,702 $2,000 Not Implemented
AS0020 # 03 Y:1991 03 1991 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,652 $36,000 Not Implemented
AS0020 # 04 Y:1991 04 1991 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,804 $18,000 Not Implemented
AS0020 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,073 $12,775 Not Implemented
AS0020 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,852 $2,168 Not Implemented