IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0026 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $12,307 $14,105 Implemented
UF0026 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $345 $4,683 Implemented
UF0027 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $642 Implemented
UF0027 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $4,143 $4,000 Not Implemented
UF0027 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $550 Implemented
UF0027 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,380 $4,766 Implemented
UF0027 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $1,445 $1,200 Implemented
UF0027 # 06 Y:1992 06 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,567 $2,820 Implemented
UF0027 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,518 $49,969 Implemented
UF0027 # 08 Y:1992 08 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,050 $0 Not Implemented
UF0027 # 09 Y:1992 09 1992 RECOVER WASTE HEAT FROM EQUIPMENT $10,881 $17,195 Not Implemented
UF0028 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $864 $2,517 Implemented
UF0028 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $6,437 $2,400 Implemented
UF0028 # 03 Y:1992 03 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,125 $1,660 Implemented
UF0028 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,440 $36,148 Implemented
GT0460 # 01 Y:1992 01 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $934 $150 Implemented
GT0460 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,100 $8,510 Implemented
GT0460 # 03 Y:1992 03 1992 DISCONNECT BALLASTS $136 $50 Implemented
GT0460 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $465 $6,040 Implemented
GT0460 # 05 Y:1992 05 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $85 $0 Implemented
GT0460 # 06 Y:1992 06 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,920 $18,300 Implemented
GT0460 # 07 Y:1992 07 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $109 $0 Implemented
GT0461 # 01 Y:1992 01 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,414 $300 Implemented
GT0461 # 02 Y:1992 02 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,427 $10,500 Implemented
GT0461 # 03 Y:1992 03 1992 REPAIR AND ELIMINATE STEAM LEAKS $5,200 $1,000 Implemented