IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0269 # 14 Y:1999 14 1999 RECOVER AND REUSE WASTE MATERIAL $15,270 $0 Not Implemented
ME0269 # 15 Y:1999 15 1999 MINIMIZE WATER USAGE $229 $100 Implemented
BD0135 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $39,862 $80,000 Not Implemented
BD0135 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,214 $1,200 Not Implemented
BD0135 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,289 $1,220 Not Implemented
BD0135 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $949 $375 Not Implemented
BD0135 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $303 $240 Not Implemented
BD0135 # 06 Y:1999 06 1999 MINIMIZE WATER USAGE $244 $1,120 Not Implemented
AS0255 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,341 $20,474 Not Implemented
AS0255 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $442 Not Implemented
AS0255 # 03 Y:1999 03 1999 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,365 $195 Not Implemented
AS0255 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,392 $120 Not Implemented
AS0255 # 05 Y:1999 05 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,137 $14,500 Not Implemented
AS0255 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,779 $120 Not Implemented
AS0255 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $3,261 $60 Not Implemented
AS0255 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $12,000 $1,500 Implemented
DS0143 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $135 Implemented
DS0143 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,177 $7,500 Implemented
DS0143 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,400 Implemented
DS0143 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $16,788 $3,567 Not Implemented
DS0143 # 05 Y:1999 05 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $16,588 $20 Not Implemented
DS0143 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,043 $640 Implemented
DS0143 # 07 Y:1999 07 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,760 $90 Implemented
DS0143 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $175 $0 Not Implemented
WV0172 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $51 $140 Implemented