IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0235 # 10 Y:2003 10 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $317 $1,200 Implemented
BD0235 # 11 Y:2003 11 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $73,846 $7,500 Implemented
BD0235 # 12 Y:2003 12 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,577 $2,000 Not Implemented
BD0235 # 13 Y:2003 13 2003 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $350 $80 Implemented
OK0666 # 01 Y:2003 01 2003 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $15,468 $30,000 Not Implemented
OK0666 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $18,000 $0 Not Implemented
OK0666 # 03 Y:2003 03 2003 INSTALL SET-BACK TIMERS $11,925 $1,200 Not Implemented
OK0666 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $543 $404 Not Implemented
OK0666 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,253 $3,276 Not Implemented
OK0666 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,844 $100 Not Implemented
OK0666 # 07 Y:2003 07 2003 USE A DIFFERENT OR RECYCLED RAW MATERIAL $136,157 $28,500 Not Implemented
OK0666 # 08 Y:2003 08 2003 IMPROVE SPACE COMFORT CONDITIONING $58,240 $20,000 Not Implemented
TA0058 # 01 Y:2003 01 2003 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $15,460 $0 Implemented
TA0058 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $400 Implemented
TA0058 # 03 Y:2003 03 2003 AIR CONDITION ONLY SPACE NECESSARY $2,500 $100 Implemented
TA0058 # 04 Y:2003 04 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,800 $0 Implemented
TA0058 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $335 $0 Implemented
TA0058 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $190 $123 Not Implemented
TA0058 # 07 Y:2003 07 2003 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $155 $0 Implemented
TA0058 # 08 Y:2003 08 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $120 Not Implemented
UD0671 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $137,400 $100,000 Not Implemented
UD0671 # 02 Y:2003 02 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,075 $70 Implemented
UD0671 # 03 Y:2003 03 2003 ADD AREA LIGHTING SWITCHES $12,090 $15,000 Not Implemented
UD0671 # 04 Y:2003 04 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,713 $0 Not Implemented
UD0671 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,275 $0 Implemented