IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0082 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,282 $2,670 Implemented
MI0082 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,313 $13,803 Not Implemented
MI0082 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,241 $610 Not Implemented
MI0082 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,594 $40 Not Implemented
MS0252 # 01 Y:2004 01 2004 USE RADIANT HEATER FOR SPOT HEATING $11,003 $10,413 Not Implemented
MS0252 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,867 $11,496 Implemented
MS0252 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,256 $230 Implemented
MS0252 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,835 $4,800 Not Implemented
MS0252 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,270 $1,731 Implemented
MS0252 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $125 Implemented
MS0252 # 07 Y:2004 07 2004 INSTALL TIMERS AND/OR THERMOSTATS $207 $355 Not Implemented
MS0252 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $132 $346 Not Implemented
OR0458 # 01 Y:2004 01 2004 MODIFY WORKLOAD $60,800 $480 Not Implemented
OR0458 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $9,440 $7,400 Not Implemented
OR0458 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,200 $4,600 Not Implemented
OR0458 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,000 Not Implemented
OR0458 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,800 $0 Not Implemented
OR0458 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,880 $3,000 Not Implemented
GT0784 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,866 $1,000 Implemented
GT0784 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $1,782 Not Implemented
GT0784 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,500 $1,200 Implemented
GT0784 # 04 Y:2004 04 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $14,255 $35,020 Not Implemented
GT0784 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $51,264 $0 Not Implemented
GT0784 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $40,320 $5,000 Not Implemented
GT0784 # 07 Y:2004 07 2004 MINIMIZE WATER USAGE $7,400 $1,840 Implemented