Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,489
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0629 # 03 Y:1997 | 03 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,595 | $5,050 | Not Implemented |
GT0629 # 04 Y:1997 | 04 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $402 | $965 | Implemented |
GT0629 # 05 Y:1997 | 05 | 1997 | MINIMIZE WATER USAGE | $13,141 | $0 | Implemented |
GT0629 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $7,415 | $800 | Implemented |
GT0629 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,680 | $900 | Implemented |
GT0629 # 08 Y:1997 | 08 | 1997 | $153,375 | $62,650 | Not Implemented | |
GT0626 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,741 | $950 | Implemented |
GT0626 # 02 Y:1997 | 02 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $21,185 | $0 | Implemented |
GT0626 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,580 | $11,230 | Not Implemented |
GT0626 # 04 Y:1997 | 04 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,730 | $1,420 | Not Implemented |
GT0626 # 05 Y:1997 | 05 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $400 | $620 | Implemented |
GT0626 # 06 Y:1997 | 06 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $7,580 | Not Implemented |
GT0626 # 07 Y:1997 | 07 | 1997 | $26,666 | $4,200 | Implemented | |
GT0626 # 08 Y:1997 | 08 | 1997 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $1,315 | $438 | Not Implemented |
GT0620 # 01 Y:1997 | 01 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,454 | $1,200 | Not Implemented |
GT0620 # 02 Y:1997 | 02 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,260 | $1,870 | Not Implemented |
GT0620 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,270 | $6,830 | Implemented |
GT0620 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $390 | $900 | Not Implemented |
GT0620 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $55 | $50 | Implemented |
GT0620 # 06 Y:1997 | 06 | 1997 | $9,546 | $50,000 | Not Implemented | |
GT0625 # 01 Y:1997 | 01 | 1997 | METER WASTE WATER | $20,840 | $0 | Not Implemented |
GT0625 # 02 Y:1997 | 02 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,500 | $137,700 | Not Implemented |
GT0625 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,080 | $400 | Implemented |
GT0625 # 04 Y:1997 | 04 | 1997 | FILTER AND REUSE HYDRAULIC OIL | $19,800 | $7,150 | Implemented |
GT0625 # 05 Y:1997 | 05 | 1997 | REDUCE VENTILATION AIR | $8,640 | $20,000 | Not Implemented |