Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,184
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0163 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,248 | $0 | Implemented |
UM0163 # 03 Y:2000 | 03 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,496 | $500 | Implemented |
UM0163 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,147 | $300 | Implemented |
UM0163 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,922 | $1,500 | Not Implemented |
UM0163 # 06 Y:2000 | 06 | 2000 | INSULATE BARE EQUIPMENT | $2,100 | $200 | Not Implemented |
UM0163 # 07 Y:2000 | 07 | 2000 | INSULATE BARE EQUIPMENT | $10,078 | $10,000 | Not Implemented |
UM0163 # 08 Y:2000 | 08 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $14,512 | $60,000 | Not Implemented |
UM0163 # 09 Y:2000 | 09 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $56,997 | $90,000 | Implemented |
UM0162 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,699 | $50 | Not Implemented |
UM0162 # 02 Y:2000 | 02 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,362 | $10,000 | Implemented |
UM0162 # 03 Y:2000 | 03 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,628 | $10,800 | Implemented |
UM0162 # 04 Y:2000 | 04 | 2000 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $15,894 | $12,000 | Implemented |
UM0162 # 05 Y:2000 | 05 | 2000 | INSTALL AUTOMATIC STACK DAMPER | $576 | $720 | Implemented |
UM0162 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,858 | $36,000 | Implemented |
UM0162 # 07 Y:2000 | 07 | 2000 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $12,510 | $24,650 | Implemented |
ND0346 # 01 Y:2000 | 01 | 2000 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $24,189 | $150,000 | Not Implemented |
ND0346 # 02 Y:2000 | 02 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $7,277 | $20,000 | Not Implemented |
ND0346 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $1,357 | $20,552 | Not Implemented |
ND0346 # 04 Y:2000 | 04 | 2000 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $25,612 | $500 | Implemented |
ND0346 # 05 Y:2000 | 05 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,004 | $50 | Implemented |
ND0346 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $38,499 | $40,000 | Not Implemented |
ND0346 # 07 Y:2000 | 07 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $838 | $1,125 | Not Implemented |
ND0346 # 08 Y:2000 | 08 | 2000 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $16,244 | $61,500 | Not Implemented |
ND0346 # 09 Y:2000 | 09 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,454 | $750 | Implemented |
ND0346 # 10 Y:2000 | 10 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $238 | $60 | Implemented |