Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0172 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $1,494 | $4,830 | Not Implemented |
WV0172 # 03 Y:1999 | 03 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,202 | $9,072 | Not Implemented |
WV0172 # 04 Y:1999 | 04 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,682 | $2,520 | Implemented |
WV0172 # 05 Y:1999 | 05 | 1999 | INSTALL SET-BACK TIMERS | $90 | $0 | Implemented |
WV0172 # 06 Y:1999 | 06 | 1999 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,160 | $2,730 | Not Implemented |
WV0172 # 07 Y:1999 | 07 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $182 | $600 | Not Implemented |
WV0172 # 08 Y:1999 | 08 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $5,510 | $1,440 | Implemented |
WV0172 # 09 Y:1999 | 09 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $48 | $0 | Implemented |
WV0172 # 10 Y:1999 | 10 | 1999 | CLEAR AND RENT EXISTING SPACE | $10,200 | $2,100 | Implemented |
UD0576 # 01 Y:1999 | 01 | 1999 | AUTOMATE FINISHING PROCESS | $270,000 | $150,000 | Not Implemented |
UD0576 # 02 Y:1999 | 02 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $269,087 | $365,000 | Not Implemented |
UD0576 # 03 Y:1999 | 03 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,377 | $4,700 | Implemented |
UD0576 # 04 Y:1999 | 04 | 1999 | USE PLASTIC PALLETS INSTEAD OF WOOD | $6,058 | $21,000 | Not Implemented |
UD0576 # 05 Y:1999 | 05 | 1999 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $2,325 | $9,165 | Not Implemented |
UD0576 # 06 Y:1999 | 06 | 1999 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $1,407 | $1,000 | Implemented |
UL0225 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $22,666 | $14,656 | Implemented |
UL0225 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $742 | $65 | Not Implemented |
UL0225 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $135,070 | $761,380 | Not Implemented |
UL0225 # 04 Y:1999 | 04 | 1999 | ADOPT IN-HOUSE MATERIAL GENERATION | $136,000 | $143,925 | Not Implemented |
UD0575 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $480,000 | $175,000 | Not Implemented |
UD0575 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $144,000 | $150,000 | Not Implemented |
UD0575 # 03 Y:1999 | 03 | 1999 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $39,515 | $10,000 | Implemented |
UD0575 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,341 | $15,000 | Implemented |
OD0140 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,272 | $14,704 | Not Implemented |
OD0140 # 02 Y:1999 | 02 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,213 | $100 | Implemented |