IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0621 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $396 $0 Not Implemented
LL0108 # 01 Y:2001 01 2001 PAY UTILITY BILLS ON TIME $268 $0 Implemented
LL0108 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,400 $0 Implemented
LL0108 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $240 $0 Not Implemented
LL0108 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,889 $300 Implemented
LL0108 # 05 Y:2001 05 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,100 $0 Not Implemented
TA0009 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,587 $585 Not Implemented
TA0009 # 02 Y:2001 02 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,350 $0 Not Implemented
TA0009 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,597 $480 Implemented
TA0009 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $364 $0 Implemented
TA0009 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $233 $0 Implemented
TA0009 # 06 Y:2001 06 2001 USE POWER DURING OFF-PEAK PERIODS $210 $0 Implemented
TA0009 # 07 Y:2001 07 2001 USE SYNTHETIC LUBRICANT $158 $0 Not Implemented
TA0009 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $146 $160 Not Implemented
TA0009 # 09 Y:2001 09 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $110 $106 Not Implemented
WI0399 # 01 Y:2001 01 2001 INSTALL TIMERS AND/OR THERMOSTATS $31,173 $2,000 Not Implemented
WI0399 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,170 $8,874 Not Implemented
WI0399 # 03 Y:2001 03 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $24,740 $0 Not Implemented
WI0399 # 04 Y:2001 04 2001 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,208 $4,500 Not Implemented
WI0399 # 05 Y:2001 05 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,894 $62,046 Not Implemented
WI0399 # 06 Y:2001 06 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,914 $4,000 Not Implemented
WI0399 # 07 Y:2001 07 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $6,301 $0 Not Implemented
WI0399 # 08 Y:2001 08 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,805 $11,500 Not Implemented
WI0399 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,549 $0 Not Implemented
WI0399 # 10 Y:2001 10 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,149 $2,009 Not Implemented