Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0326 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,817 | $100 | n/a |
AS0326 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,641 | $1,600 | n/a |
AS0326 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,936 | $0 | n/a |
AS0326 # 04 Y:2002 | 04 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,799 | $489 | n/a |
AS0326 # 05 Y:2002 | 05 | 2002 | AUTOMATE FINISHING PROCESS | $23,920 | $582 | n/a |
AS0326 # 06 Y:2002 | 06 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,080 | $750 | n/a |
AS0326 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $12,362 | $100 | n/a |
AS0325 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,971 | $23,524 | n/a |
AS0325 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,032 | $60 | n/a |
AS0325 # 03 Y:2002 | 03 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,721 | $92 | n/a |
AS0325 # 04 Y:2002 | 04 | 2002 | USE SYNTHETIC LUBRICANT | $308 | $279 | n/a |
AS0325 # 05 Y:2002 | 05 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,009 | $4,550 | n/a |
AS0325 # 06 Y:2002 | 06 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $670 | $240 | n/a |
AS0325 # 07 Y:2002 | 07 | 2002 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $15,570 | $588 | n/a |
AS0325 # 08 Y:2002 | 08 | 2002 | CLEAR AND RENT EXISTING SPACE | $107,840 | $21,700 | n/a |
AS0325 # 09 Y:2002 | 09 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $68,428 | $9,216 | n/a |
AS0324 # 01 Y:2002 | 01 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,071 | $1,750 | Not Implemented |
AS0324 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,718 | $4,200 | Not Implemented |
AS0324 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,806 | $9,004 | Implemented |
AS0324 # 04 Y:2002 | 04 | 2002 | INSTALL OCCUPANCY SENSORS | $444 | $1,400 | Not Implemented |
AS0324 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,673 | $0 | Implemented |
AS0324 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,714 | $120 | Not Implemented |
AS0324 # 07 Y:2002 | 07 | 2002 | INSTALL SKYLIGHTS | $5,831 | $6,702 | Not Implemented |
AS0324 # 08 Y:2002 | 08 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $464 | $230 | Not Implemented |
AS0324 # 09 Y:2002 | 09 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $77,357 | $15,800 | Not Implemented |