Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0693 # 08 Y:2000 | 08 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $14,770 | $1,250 | Implemented |
GT0693 # 09 Y:2000 | 09 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $60,000 | $120,000 | Not Implemented |
IA0244 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $500 | $58 | Implemented |
IA0244 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $478 | $164 | Not Implemented |
IA0244 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $128 | $137 | Implemented |
IA0244 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,657 | $0 | Not Implemented |
IA0244 # 05 Y:2000 | 05 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $7,765 | $16,000 | Not Implemented |
IA0244 # 06 Y:2000 | 06 | 2000 | MINIMIZE WATER USAGE | $4,559 | $9,800 | Implemented |
IA0244 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $173 | $72 | Not Implemented |
OK0597 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,212 | $19,769 | Implemented |
OK0597 # 02 Y:2000 | 02 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $794 | $176 | Not Implemented |
OK0597 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $2,790 | $1,500 | Not Implemented |
OK0597 # 04 Y:2000 | 04 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,995 | $4,000 | Not Implemented |
OK0597 # 05 Y:2000 | 05 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $19,012 | $2,700 | Not Implemented |
UD0599 # 01 Y:2000 | 01 | 2000 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $10,974 | $10,755 | Not Implemented |
UD0599 # 02 Y:2000 | 02 | 2000 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $8,795 | $0 | Implemented |
UD0599 # 03 Y:2000 | 03 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,987 | $20,000 | Implemented |
UD0599 # 04 Y:2000 | 04 | 2000 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,956 | $2,500 | Implemented |
UD0599 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,883 | $8,852 | Not Implemented |
UD0599 # 06 Y:2000 | 06 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,628 | $0 | Implemented |
UD0599 # 07 Y:2000 | 07 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,401 | $1,000 | Implemented |
UD0599 # 08 Y:2000 | 08 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $900 | $0 | Not Implemented |
UD0599 # 09 Y:2000 | 09 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $872 | $500 | Not Implemented |
MS0163 # 01 Y:2000 | 01 | 2000 | COMBINE UTILITY METERS | $18,393 | $1,834 | Not Implemented |
MS0163 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,598 | $2,700 | Not Implemented |