IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0219 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,206 $0 Implemented
SF0219 # 02 Y:2001 02 2001 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $5,816 $5,705 Implemented
SF0219 # 03 Y:2001 03 2001 MODERATE COOLING TOWER OUTLET TEMPERATURE $415 $406 Implemented
SF0219 # 04 Y:2001 04 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $529 $840 Implemented
SF0219 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,695 $11,140 Not Implemented
SF0219 # 06 Y:2001 06 2001 $14,216 $507 Implemented
MI0006 # 01 Y:2001 01 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,105 $2,513 Not Implemented
MI0006 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,467 $333 Not Implemented
MI0006 # 03 Y:2001 03 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $16,244 $2,084 Not Implemented
MI0006 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,608 $312 Not Implemented
MI0006 # 05 Y:2001 05 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,646 $7,000 Not Implemented
MI0006 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,215 $1,126 Not Implemented
MI0006 # 07 Y:2001 07 2001 $120,000 $44,200 Not Implemented
MS0183 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $7,236 $8,235 Not Implemented
MS0183 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $190 Implemented
MS0183 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $142 $230 Not Implemented
MS0183 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $711 $2,074 Not Implemented
MS0183 # 05 Y:2001 05 2001 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $1,957 $432 Not Implemented
MS0183 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,296 $50 Not Implemented
SF0216 # 01 Y:2001 01 2001 $83,016 $0 Implemented
SF0216 # 02 Y:2001 02 2001 UPGRADE CONTROLS ON COMPRESSORS $24,891 $400 Implemented
SF0216 # 03 Y:2001 03 2001 $1,884 $530 Not Implemented
SF0216 # 04 Y:2001 04 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $14,286 $2,150 Implemented
SF0216 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,905 $7,982 Implemented
SF0216 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,460 $5,295 Not Implemented