Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0006 # 01 Y:2001 | 01 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,105 | $2,513 | Not Implemented |
MI0006 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,467 | $333 | Not Implemented |
MI0006 # 03 Y:2001 | 03 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $16,244 | $2,084 | Not Implemented |
MI0006 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,608 | $312 | Not Implemented |
MI0006 # 05 Y:2001 | 05 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $22,646 | $7,000 | Not Implemented |
MI0006 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,215 | $1,126 | Not Implemented |
MI0006 # 07 Y:2001 | 07 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $120,000 | $44,200 | Not Implemented |
SF0219 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,206 | $0 | Implemented |
SF0219 # 02 Y:2001 | 02 | 2001 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $5,816 | $5,705 | Implemented |
SF0219 # 03 Y:2001 | 03 | 2001 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $415 | $406 | Implemented |
SF0219 # 04 Y:2001 | 04 | 2001 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $529 | $840 | Implemented |
SF0219 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,695 | $11,140 | Not Implemented |
SF0219 # 06 Y:2001 | 06 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $14,216 | $507 | Implemented |
MS0183 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PLANT POWER FACTOR | $7,236 | $8,235 | Not Implemented |
MS0183 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,000 | $190 | Implemented |
MS0183 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $142 | $230 | Not Implemented |
MS0183 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $711 | $2,074 | Not Implemented |
MS0183 # 05 Y:2001 | 05 | 2001 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $1,957 | $432 | Not Implemented |
MS0183 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,296 | $50 | Not Implemented |
SF0216 # 01 Y:2001 | 01 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $83,016 | $0 | Implemented |
SF0216 # 02 Y:2001 | 02 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $24,891 | $400 | Implemented |
SF0216 # 03 Y:2001 | 03 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $1,884 | $530 | Not Implemented |
SF0216 # 04 Y:2001 | 04 | 2001 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $14,286 | $2,150 | Implemented |
SF0216 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,905 | $7,982 | Implemented |
SF0216 # 06 Y:2001 | 06 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $38,460 | $5,295 | Not Implemented |