Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0542 # 15 Y:2017 | 15 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $48 | $105 | Not Implemented |
SD0544 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $23,627 | $14,788 | Not Implemented |
SD0544 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,529 | $41,589 | Implemented |
SD0544 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,835 | $26,705 | Implemented |
SD0544 # 04 Y:2017 | 04 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,488 | $8,800 | Implemented |
SD0544 # 05 Y:2017 | 05 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $5,008 | $2,160 | Not Implemented |
SD0544 # 06 Y:2017 | 06 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,765 | $3,500 | Implemented |
SD0544 # 07 Y:2017 | 07 | 2017 | USE PHOTOCELL CONTROLS | $3,481 | $10,611 | Implemented |
SD0544 # 08 Y:2017 | 08 | 2017 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $2,798 | $7,832 | Implemented |
IP0082 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $86 | $0 | Implemented |
IP0082 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $866 | $0 | Implemented |
IP0082 # 03 Y:2017 | 03 | 2017 | PAY BILLS ON TIME TO AVOID LATE FEES | $828 | $0 | Implemented |
IP0082 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,933 | $3 | Not Implemented |
IP0082 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $24,829 | $2,670 | Implemented |
IP0082 # 06 Y:2017 | 06 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,541 | $1,698 | Not Implemented |
IP0082 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $3,769 | $3,724 | Implemented |
IP0082 # 08 Y:2017 | 08 | 2017 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $31,824 | $38,940 | Not Implemented |
IP0082 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,194 | $19,486 | Implemented |
IP0082 # 10 Y:2017 | 10 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $134 | $270 | Implemented |
IP0082 # 11 Y:2017 | 11 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,464 | $9,078 | Not Implemented |
IP0082 # 12 Y:2017 | 12 | 2017 | OPTIMIZE PLANT POWER FACTOR | $7,316 | $21,686 | Implemented |
IP0082 # 13 Y:2017 | 13 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $627 | Not Implemented |
AM0727 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,881 | $11,400 | Implemented |
AM0727 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $6,260 | $23,000 | Not Implemented |
AM0727 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,179 | $2,000 | Implemented |