IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0455 # 12 Y:2014 12 2014 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $43,986 $154,938 Implemented
SF0455 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $5,163 $31,786 Implemented
SF0455 # 14 Y:2014 14 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,061 $12,152 Implemented
SF0456 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,140 $0 Implemented
SF0456 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,324 $80 Implemented
SF0456 # 03 Y:2014 03 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $883 $327 Implemented
SF0456 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $114 $127 Implemented
SF0456 # 05 Y:2014 05 2014 INSULATE BARE EQUIPMENT $502 $638 Implemented
SF0456 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,511 $18,537 Implemented
SD0492 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $153,319 $210,684 Not Implemented
SD0492 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,158 $34,531 Implemented
SD0492 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $3,880 $1,527 Implemented
SD0492 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,731 $4,350 Implemented
SD0492 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $881 $1,791 Implemented
SD0492 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $531 $400 Implemented
SD0491 # 01 Y:2014 01 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,862 $5,500 Not Implemented
SD0491 # 02 Y:2014 02 2014 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,726 $194 Not Implemented
SD0491 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $924 $3,450 Not Implemented
SD0491 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $609 $957 Not Implemented
SD0491 # 05 Y:2014 05 2014 USE PHOTOCELL CONTROLS $445 $555 Not Implemented
SD0491 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $200 Implemented
SD0490 # 01 Y:2014 01 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,150 $3,300 Implemented
SD0490 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,842 $5,480 Not Implemented
SD0490 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,773 $3,775 Implemented
SD0490 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,633 $500 Not Implemented