IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0182 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $531 $531 Implemented
UF0182 # 04 Y:1997 04 1997 COVER OPEN TANKS $288 $63 Not Implemented
UF0182 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $287 $1,000 Implemented
UF0182 # 06 Y:1997 06 1997 REPLACE BOILER $653 $0 Implemented
UF0182 # 07 Y:1997 07 1997 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $4,567 $2,400 Not Implemented
UF0182 # 08 Y:1997 08 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $32,361 $65,000 Not Implemented
UF0182 # 09 Y:1997 09 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $33,242 $113,600 Not Implemented
MA0394 # 01 Y:1997 01 1997 CLEAR AND RENT EXISTING SPACE $262,500 $0 Implemented
MA0394 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,097 $320,340 Implemented
MA0394 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,317 $24,908 Not Implemented
MA0394 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,246 $4,225 Not Implemented
MA0394 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,330 $271 Implemented
MA0394 # 06 Y:1997 06 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,120 $0 Not Implemented
OD0088 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $359 $672 n/a
AR0119 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,039 $1,110 Not Implemented
AR0119 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,439 $3,524 Implemented
AR0119 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,961 $0 Implemented
AR0119 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,406 $500 Not Implemented
AR0119 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $907 $90 Implemented
AR0119 # 06 Y:1997 06 1997 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS $498 $0 Not Implemented
AR0119 # 07 Y:1997 07 1997 RECOVER AND REUSE WASTE MATERIAL $48,811 $10,230 Not Implemented
AR0119 # 08 Y:1997 08 1997 RECOVER AND REUSE WASTE MATERIAL $20,099 $16,000 Implemented
AR0119 # 09 Y:1997 09 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,032 $21,600 Implemented
KU0475 # 01 Y:1997 01 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,260 $30,000 Not Implemented
KU0475 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,250 $310 Implemented