IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,184

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0151 # 04 Y:1999 04 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $5,903 $11,000 Implemented
UM0151 # 05 Y:1999 05 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $13,689 $960 Not Implemented
UM0148 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $2,464 Implemented
UM0148 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,069 $500 Not Implemented
UM0148 # 03 Y:1999 03 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,056 $40,000 Not Implemented
UM0148 # 04 Y:1999 04 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $12,311 $40,000 Implemented
UM0148 # 05 Y:1999 05 1999 EXPAND OPERATIONS INTO UNUSED SPACE $342,900 $683,000 Not Implemented
UM0146 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,736 $220 Not Implemented
UM0146 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $78 $200 Not Implemented
UM0146 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $2,510 $200 Not Implemented
UM0146 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,807 $40,000 Not Implemented
UM0146 # 05 Y:1999 05 1999 USE A RAG RECYCLE SERVICE $925 $0 Not Implemented
UM0146 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $6,000 $3,600 Not Implemented
UM0146 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,207 $40,000 Not Implemented
UM0145 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,720 $300 Implemented
UM0145 # 02 Y:1999 02 1999 USE RADIANT HEATER FOR SPOT HEATING $2,157 $4,500 Not Implemented
UM0145 # 03 Y:1999 03 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,970 $40,000 Not Implemented
UM0145 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,978 $11,600 Not Implemented
UM0145 # 05 Y:1999 05 1999 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $50,143 $85,000 Not Implemented
UM0145 # 06 Y:1999 06 1999 USE ABSORPTION, EXTRACTION TO REMOVE CONTAMINANTS $24,222 $60,000 Implemented
UM0145 # 07 Y:1999 07 1999 IMPROVE SPACE COMFORT CONDITIONING $16,869 $14,495 Implemented
UM0145 # 08 Y:1999 08 1999 INSTALL MAGAZINES FOR TEMPORARY STORAGE $32,500 $2,000 Not Implemented
UM0144 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,661 $110 Implemented
UM0144 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $647 $1,000 Implemented
UM0144 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,285 $350 Implemented