IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0517 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,446 $48,382 Not Implemented
AS0517 # 03 Y:2022 03 2022 USE OPTIMUM THICKNESS INSULATION $10,522 $15,516 Implemented
AS0517 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,331 $39,600 Implemented
AS0517 # 05 Y:2022 05 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,692 $2,880 Not Implemented
AS0517 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,189 $859 Implemented
AS0517 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,256 $1,541 Implemented
SF0583 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,948 $240 Implemented
SF0583 # 02 Y:2022 02 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,046 $2,379 Implemented
SF0583 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,018 $13,272 Not Implemented
SF0583 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,208 $6,293 Not Implemented
SF0583 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,181 $30,438 Implemented
MS0395 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,342 $210,000 Not Implemented
MS0395 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,723 $18,748 Implemented
MS0395 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $540 Implemented
MS0395 # 04 Y:2022 04 2022 UPGRADE OBSOLETE EQUIPMENT $2,447 $15,480 Not Implemented
UF0575 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $320,724 $1,068,750 Implemented
UF0575 # 02 Y:2022 02 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $175,432 $0 Not Implemented
UF0575 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $59,112 $64,054 Implemented
UF0575 # 04 Y:2022 04 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,193 $12,000 Not Implemented
UF0575 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,361 $0 Implemented
UF0575 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $290 Implemented
UF0575 # 07 Y:2022 07 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $200,000 $0 Implemented
LS2215 # 01 Y:2022 01 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $50,000 $0 Implemented
LS2215 # 02 Y:2022 02 2022 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $9,603 $1,118 Implemented
LS2215 # 03 Y:2022 03 2022 INSTALL SENSORS TO DETECT AND AVOID JAMS $72,450 $2,400 Implemented