Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0139 # 02 Y:1999 02 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $447 $4,020 Not Implemented
OD0139 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $82 $20 Not Implemented
OD0139 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,555 $2,000 Not Implemented
UM0142 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $450 Implemented
UM0142 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,691 $1,250 Implemented
UM0142 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $39 $0 Implemented
UM0142 # 04 Y:1999 04 1999 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $55,979 $38,958 Not Implemented
UM0142 # 05 Y:1999 05 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $44,187 $52,200 Not Implemented
UM0142 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $7,489 $10,860 Implemented
UM0142 # 07 Y:1999 07 1999 METER WASTE WATER $6,412 $500 Implemented
UM0142 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $150,000 $150,000 Not Implemented
WV0170 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,495 $265 Not Implemented
WV0170 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $180 Not Implemented
WV0170 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,864 $600 Implemented
WV0170 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,084 $98 Implemented
WV0170 # 05 Y:1999 05 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,095 $4,400 Not Implemented
WV0170 # 06 Y:1999 06 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,114 $300 Implemented
WV0170 # 07 Y:1999 07 1999 INSULATE BARE EQUIPMENT $486 $450 Not Implemented
WV0170 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $750 $40 Not Implemented
WV0170 # 09 Y:1999 09 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,644 $11,000 Not Implemented
WV0170 # 10 Y:1999 10 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $576 $42 Implemented
WV0170 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $16,640 $720 Not Implemented
WV0170 # 12 Y:1999 12 1999 APPLY FOR INVESTMENT INCENTIVES $21,376 $0 Implemented
DS0136 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $1,047 $1,960 Implemented
DS0136 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,330 $29,424 Implemented