IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0047 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,175 $821 Implemented
MA0047 # 03 Y:1985 03 1985 HEAT WATER WITH EXHAUST HEAT $1,144 $2,804 Implemented
MA0047 # 04 Y:1985 04 1985 REPAIR OR REPLACE STEAM TRAPS $16,278 $715 Implemented
MA0047 # 05 Y:1985 05 1985 INSTALL TIMERS AND/OR THERMOSTATS $3,640 $2,000 Implemented
MA0041 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,442 $2,640 Implemented
MA0041 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,972 $9,826 Implemented
MA0041 # 03 Y:1985 03 1985 AIR CONDITION ONLY SPACE NECESSARY $16,180 $17,180 Not Implemented
MA0041 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $192 $143 Implemented
MA0031 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $376 $45 Implemented
MA0031 # 02 Y:1985 02 1985 INSTALL SET-BACK TIMERS $376 $186 Not Implemented
MA0031 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $91 $100 Implemented
MA0031 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $209 $540 Not Implemented
MA0031 # 05 Y:1985 05 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,197 $0 Not Implemented
MA0031 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $179 $405 Implemented
MA0033 # 01 Y:1985 01 1985 SELL COMBUSTIBLE WASTE $71,743 $0 Not Implemented
MA0033 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,606 $440 Implemented
MA0033 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $9,021 $4,221 Implemented
MA0033 # 04 Y:1985 04 1985 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $11,988 $130 Not Implemented
MA0033 # 05 Y:1985 05 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,483 $1,300 Not Implemented
MA0033 # 06 Y:1985 06 1985 REPAIR OR REPLACE STEAM TRAPS $47,000 $640 Implemented
MA0033 # 07 Y:1985 07 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,905 $642 Implemented
MA0030 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,013 $1,515 Implemented
MA0030 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,095 $1,536 Implemented
MA0030 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $135 $214 Implemented
MA0030 # 04 Y:1985 04 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $10,416 $8,764 Implemented