Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0110 # 05 Y:1991 | 05 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $240 | $100 | Not Implemented |
AM0110 # 06 Y:1991 | 06 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $200 | $160 | Not Implemented |
AM0110 # 07 Y:1991 | 07 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $85 | $0 | Not Implemented |
AM0111 # 01 Y:1991 | 01 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,760 | $0 | Implemented |
AM0111 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $6,300 | $7,100 | Implemented |
AM0111 # 03 Y:1991 | 03 | 1991 | OPTIMIZE PLANT POWER FACTOR | $3,530 | $5,700 | Implemented |
AM0111 # 04 Y:1991 | 04 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,130 | $5,540 | Implemented |
AM0111 # 05 Y:1991 | 05 | 1991 | INSULATE BARE EQUIPMENT | $1,820 | $4,800 | Implemented |
AM0111 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $102 | $34 | Implemented |
AM0112 # 01 Y:1991 | 01 | 1991 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $2,470 | $5,000 | Not Implemented |
AM0112 # 02 Y:1991 | 02 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $4,670 | $19,000 | Not Implemented |
AM0112 # 03 Y:1991 | 03 | 1991 | REPAIR AND ELIMINATE STEAM LEAKS | $3,900 | $365 | Not Implemented |
AM0112 # 04 Y:1991 | 04 | 1991 | INSTALL / REPAIR INSULATION ON STEAM LINES | $340 | $310 | Not Implemented |
AM0112 # 05 Y:1991 | 05 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $195 | $235 | Not Implemented |
AM0113 # 01 Y:1991 | 01 | 1991 | USE UTILITY CONTROLLED POWER MANAGEMENT | $687,000 | $250,000 | Implemented |
AM0113 # 02 Y:1991 | 02 | 1991 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $34,390 | $88,900 | Implemented |
AM0113 # 03 Y:1991 | 03 | 1991 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,300 | $280 | Implemented |
AM0113 # 04 Y:1991 | 04 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $2,815 | $400 | Implemented |
AM0113 # 05 Y:1991 | 05 | 1991 | INSULATE BARE EQUIPMENT | $340 | $290 | Implemented |
AS0019 # 01 Y:1991 | 01 | 1991 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,610 | $0 | Implemented |
AS0019 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $95 | $155 | Implemented |
AS0019 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $140 | $150 | Implemented |
AS0019 # 04 Y:1991 | 04 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $402 | $200 | Implemented |
AS0019 # 05 Y:1991 | 05 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $390 | $1,560 | Implemented |
AS0019 # 06 Y:1991 | 06 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $696 | $500 | Implemented |