IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0119 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $871 $514 Implemented
SF0119 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $812 $3,000 Implemented
SF0119 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $354 $845 Not Implemented
SF0119 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,872 $250 Implemented
SF0119 # 06 Y:1997 06 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $250 $250 Implemented
SF0119 # 07 Y:1997 07 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $779,640 $275,000 Implemented
WI0300 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $61,113 $30,000 Implemented
WI0300 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $11,999 $17,000 Not Implemented
WI0300 # 03 Y:1997 03 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $5,148 $17,000 Not Implemented
WI0300 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,810 $90 Implemented
WI0300 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $606 $640 Not Implemented
WI0300 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $2,192 $0 Implemented
WI0300 # 07 Y:1997 07 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,932 $400 Not Implemented
WI0300 # 08 Y:1997 08 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,355 $500 Not Implemented
WI0300 # 09 Y:1997 09 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,241 $2,739 Not Implemented
WI0300 # 10 Y:1997 10 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,112 $5,000 Not Implemented
WI0300 # 11 Y:1997 11 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $585 $0 Implemented
TN0614 # 01 Y:1997 01 1997 MODIFY CURRENT INCENTIVE PROGRAM $35,750 $10,000 Not Implemented
TN0614 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $24,190 $41,800 Implemented
TN0614 # 03 Y:1997 03 1997 USE RADIANT HEATER FOR SPOT HEATING $16,200 $9,300 Implemented
TN0614 # 04 Y:1997 04 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,875 $0 Implemented
TN0614 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $340 Not Implemented
TN0614 # 06 Y:1997 06 1997 INSTALL TIMERS AND/OR THERMOSTATS $320 $580 Not Implemented
UD0520 # 01 Y:1997 01 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $5,304 $14,840 Not Implemented
UD0520 # 02 Y:1997 02 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $12,472 $24,000 Not Implemented