IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0639 # 01 Y:2002 01 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,500 $0 Implemented
OK0639 # 02 Y:2002 02 2002 IMPROVE SPACE COMFORT CONDITIONING $42,500 $3,150 Not Implemented
OK0639 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $258 $717 Implemented
OK0639 # 04 Y:2002 04 2002 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,338 $4,126 Not Implemented
OK0639 # 05 Y:2002 05 2002 INSTALL SET-BACK TIMERS $6,583 $160 Implemented
OK0639 # 06 Y:2002 06 2002 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $6,380 $14,226 Implemented
LE0136 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,384 $1,200 Not Implemented
LE0136 # 02 Y:2002 02 2002 REPAIR OR REPLACE STEAM TRAPS $34,475 $17,000 Not Implemented
LE0136 # 03 Y:2002 03 2002 RECOVER AND REUSE COOLING WATER $1,527 $2,000 Not Implemented
LE0136 # 04 Y:2002 04 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $34,222 $60,000 Not Implemented
LE0136 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,262 $1,000 Not Implemented
LE0135 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,955 $2,500 Not Implemented
LE0135 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,721 $2,500 Not Implemented
LE0135 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,451 $0 Implemented
LE0135 # 04 Y:2002 04 2002 COVER OPEN TANKS $4,639 $12,000 Not Implemented
LE0135 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,792 $0 Implemented
LE0135 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $1,066 $200 Implemented
LE0135 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $62,395 $12,000 Implemented
LE0135 # 08 Y:2002 08 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,654 $630 Implemented
LM0034 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $20,645 $300 Implemented
LM0034 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,353 $1,480 Not Implemented
LM0034 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,937 $200 Not Implemented
LM0034 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,911 $0 Implemented
LM0034 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,006 $2,640 Implemented
LM0034 # 06 Y:2002 06 2002 USE OPTIMUM THICKNESS INSULATION $6,347 $900 Not Implemented