Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0380 # 08 Y:2004 | 08 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $1,211 | $150 | Implemented |
AS0380 # 09 Y:2004 | 09 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $559 | $2,178 | Not Implemented |
WV0294 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,792 | $30,627 | Not Implemented |
WV0294 # 02 Y:2004 | 02 | 2004 | INSTALL OCCUPANCY SENSORS | $10,219 | $4,900 | Not Implemented |
WV0294 # 03 Y:2004 | 03 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $5,704 | $230 | Implemented |
WV0294 # 04 Y:2004 | 04 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,247 | $2,660 | Implemented |
WV0294 # 05 Y:2004 | 05 | 2004 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $509,116 | $20,000 | Not Implemented |
WV0294 # 06 Y:2004 | 06 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,472 | $920 | Implemented |
WV0294 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,431 | $784 | Implemented |
WV0294 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,317 | $215 | Implemented |
WV0294 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $609 | $46 | Implemented |
WV0294 # 10 Y:2004 | 10 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $232 | $129 | Not Implemented |
UU0061 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,895 | $18,633 | Not Implemented |
UU0061 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $267 | $1,000 | Not Implemented |
UU0061 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $274 | $0 | Implemented |
UU0061 # 04 Y:2004 | 04 | 2004 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $18,030 | $11,000 | Not Implemented |
UU0061 # 05 Y:2004 | 05 | 2004 | CONTRACT OUT MAINTENANCE | $15,000 | $2,000 | Not Implemented |
UU0061 # 06 Y:2004 | 06 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $351 | $432 | Implemented |
WI0469 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,616 | $14,400 | Not Implemented |
WI0469 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,071 | $0 | Implemented |
WI0469 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $626 | $0 | Implemented |
WI0469 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $588 | $249 | Implemented |
WI0469 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $463 | $640 | Not Implemented |
WI0469 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $107 | Implemented |
WI0472 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,956 | $16,640 | n/a |