IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0299 # 14 Y:1998 14 1998 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $6 $0 Implemented
UF0205 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,940 $10,390 Implemented
UF0205 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,997 $3,200 Implemented
UF0205 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,422 $1,215 Not Implemented
UF0205 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $31,516 $22,000 Implemented
UF0205 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $3,075 $471 Implemented
UF0205 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $13,598 $40,806 Implemented
UF0205 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,914 $10,000 Not Implemented
UF0205 # 08 Y:1998 08 1998 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $21,300 $45,000 Not Implemented
UF0205 # 09 Y:1998 09 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,360 $10,320 Implemented
UF0205 # 10 Y:1998 10 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,160 $10,000 Implemented
UF0205 # 11 Y:1998 11 1998 UPGRADE CONVEYORS $84,000 $10,500 Implemented
UF0204 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,991 $5,652 Implemented
UF0204 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,088 $792 Not Implemented
UF0204 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,777 $4,604 Not Implemented
UF0204 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $980 $1,000 Implemented
UF0204 # 05 Y:1998 05 1998 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $46,067 $116,000 Implemented
UF0204 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,919 $1,200 Implemented
UF0204 # 07 Y:1998 07 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,380 $0 Not Implemented
UF0204 # 08 Y:1998 08 1998 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $28,601 $2,500 Not Implemented
UF0204 # 09 Y:1998 09 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,000 $4,000 Not Implemented
CO0418 # 01 Y:1998 01 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,020 $2,000 Implemented
CO0418 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,800 $700 Implemented
CO0418 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $640 $330 Implemented
CO0418 # 04 Y:1998 04 1998 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $7,100 $0 Not Implemented