IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0487 # 07 Y:2001 07 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $61,000 $23,000 Not Implemented
MA0487 # 08 Y:2001 08 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $50,300 $13,000 Not Implemented
MA0487 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $850 Not Implemented
IA0265 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,585 $989 Implemented
IA0265 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $512 $116 Not Implemented
IA0265 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,284 $887 Not Implemented
IA0265 # 04 Y:2001 04 2001 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $18,000 $22,100 Implemented
IA0265 # 05 Y:2001 05 2001 MOVE PRODUCT USING MECHANICAL MEANS $96,543 $50,000 Not Implemented
IA0265 # 06 Y:2001 06 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,603 $1,088 Implemented
WI0397 # 01 Y:2001 01 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,173 $0 Implemented
WI0397 # 02 Y:2001 02 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,674 $7,700 Not Implemented
WI0397 # 03 Y:2001 03 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $3,585 $10,000 Not Implemented
WI0397 # 04 Y:2001 04 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,972 $6,675 Not Implemented
WI0397 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $1,025 $2,400 Not Implemented
WI0397 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $813 $0 Implemented
WI0397 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $640 Implemented
WI0397 # 08 Y:2001 08 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $502 $0 Implemented
CO0483 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,160 $0 Implemented
CO0483 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $500 $1,000 Not Implemented
CO0483 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0483 # 04 Y:2001 04 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,810 $4,730 Implemented
CO0483 # 05 Y:2001 05 2001 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $1,930 $1,930 Not Implemented
LE0111 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,514 $2,000 Implemented
LE0111 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $7,197 $323 Implemented
LE0111 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $5,050 $109 Not Implemented