IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0226 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,660 $1,669 Not Implemented
MS0226 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,417 $205 Implemented
MS0226 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $886 $591 Not Implemented
SF0260 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,136 $0 n/a
SF0260 # 02 Y:2003 02 2003 UPGRADE CONTROLS ON COMPRESSORS $1,100 $188 n/a
SF0260 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $376 $388 n/a
SF0260 # 04 Y:2003 04 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,415 $9,181 n/a
SF0260 # 05 Y:2003 05 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,800 $9,550 n/a
UU0046 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,936 $5,500 Not Implemented
UU0046 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,075 $0 Not Implemented
UU0046 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $12,187 $14,400 Not Implemented
UU0046 # 04 Y:2003 04 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,186 $9,000 Not Implemented
UU0046 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $6,168 $750 Not Implemented
UU0046 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,686 $7,815 Implemented
UU0046 # 07 Y:2003 07 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,727 $3,889 Not Implemented
OK0662 # 01 Y:2003 01 2003 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $832 $3,222 Not Implemented
OK0662 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $181 $300 Not Implemented
OK0662 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,135 $3,289 Not Implemented
OK0662 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $406 $221 Not Implemented
OK0662 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $864 Not Implemented
OK0662 # 06 Y:2003 06 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,326 $23,100 n/a
OK0662 # 07 Y:2003 07 2003 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,701 $1,011 Not Implemented
OK0662 # 08 Y:2003 08 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,730 $1,000 Not Implemented
MS0225 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,764 $670 Implemented
MS0225 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,290 $4,667 Implemented