IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0225 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,074 $1,368 Not Implemented
MS0225 # 04 Y:2003 04 2003 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,449 $400 Not Implemented
MS0225 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $244 $296 Not Implemented
UD0670 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $9,320 $4,000 Not Implemented
UD0670 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,300 $5,520 Not Implemented
UD0670 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,440 $20,540 Implemented
UD0670 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,218 $0 Implemented
UD0670 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,644 $3,620 Not Implemented
UD0670 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $1,597 $144 Implemented
UD0670 # 07 Y:2003 07 2003 DISCONNECT BALLASTS $1,367 $70 Implemented
UD0670 # 08 Y:2003 08 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,243 $2,500 Not Implemented
UD0670 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $813 $1,458 Implemented
UD0670 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $730 $160 Not Implemented
TA0056 # 01 Y:2003 01 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $190,000 $141,875 Not Implemented
TA0056 # 02 Y:2003 02 2003 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $13,500 $1,075 Not Implemented
TA0056 # 03 Y:2003 03 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,726 $0 Implemented
TA0056 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $880 $325 Implemented
TA0056 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $770 $0 Implemented
TA0056 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $1,128 Implemented
AM0440 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,150 $500 Implemented
AM0440 # 02 Y:2003 02 2003 REUSE RAGS UNTIL COMPLETELY SOILED $4,500 $0 Implemented
AM0440 # 03 Y:2003 03 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,010 $340 Not Implemented
AM0440 # 04 Y:2003 04 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,553 $800 Implemented
AM0440 # 05 Y:2003 05 2003 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,490 $2,880 Implemented
AM0440 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $830 $42 Implemented