Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1003 # 05 Y:2019 | 05 | 2019 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $10,817 | $1,400 | Implemented |
OK1003 # 06 Y:2019 | 06 | 2019 | PAY UTILITY BILLS ON TIME | $9,631 | $0 | Not Implemented |
OK1003 # 07 Y:2019 | 07 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $48,286 | $9,545 | Implemented |
OK1003 # 08 Y:2019 | 08 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,867 | $4,544 | Not Implemented |
SD0576 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,703 | $57,500 | Implemented |
SD0576 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,047 | $900 | Not Implemented |
SD0576 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,280 | $8,325 | Not Implemented |
SD0576 # 04 Y:2019 | 04 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,774 | $5,676 | Implemented |
SD0576 # 05 Y:2019 | 05 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $587 | $1,720 | Implemented |
SD0576 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $148 | $350 | Implemented |
OR0715 # 01 Y:2019 | 01 | 2019 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $4,573 | $5,513 | Not Implemented |
OR0715 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,166 | $71,155 | Not Implemented |
OR0715 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,204 | $0 | Implemented |
OR0715 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $948 | $0 | Implemented |
SF0534 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,648 | $728 | Implemented |
SF0534 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,579 | $4,190 | Not Implemented |
SF0534 # 03 Y:2019 | 03 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $562 | $946 | Not Implemented |
SF0534 # 04 Y:2019 | 04 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,765 | $14,350 | Implemented |
SF0534 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,333 | $31,340 | Implemented |
SF0534 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,731 | $31,790 | Not Implemented |
SF0534 # 07 Y:2019 | 07 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,172 | $1,636 | Implemented |
SF0534 # 08 Y:2019 | 08 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $170,541 | $650,232 | Not Implemented |
WM0131 # 01 Y:2019 | 01 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $33,801 | $0 | Not Implemented |
WM0131 # 02 Y:2019 | 02 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,168 | $105,757 | Not Implemented |
WM0131 # 03 Y:2019 | 03 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $18,069 | $5,612 | Implemented |