Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0151 # 04 Y:2000 | 04 | 2000 | INSTALL SKYLIGHTS | $106 | $180 | Not Implemented |
OD0151 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,229 | $1,815 | Not Implemented |
OD0151 # 06 Y:2000 | 06 | 2000 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $180 | $725 | Not Implemented |
TN0675 # 01 Y:2000 | 01 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $72,335 | $1,075 | Not Implemented |
TN0675 # 02 Y:2000 | 02 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $20,125 | $25,600 | Not Implemented |
TN0675 # 03 Y:2000 | 03 | 2000 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $18,800 | $16,000 | Implemented |
TN0675 # 04 Y:2000 | 04 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,789 | $16,600 | Implemented |
TN0675 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $8,725 | $6,000 | Implemented |
TN0675 # 06 Y:2000 | 06 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,450 | $3,300 | Implemented |
TN0675 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,844 | $0 | Not Implemented |
NC0181 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,376 | $5,400 | Not Implemented |
NC0181 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,754 | $65,000 | Not Implemented |
NC0181 # 03 Y:2000 | 03 | 2000 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,564 | $37,378 | Not Implemented |
NC0181 # 04 Y:2000 | 04 | 2000 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,692 | $18,000 | Not Implemented |
NC0181 # 05 Y:2000 | 05 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $14,765 | $42,000 | Not Implemented |
TN0673 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,075 | $2,610 | Implemented |
TN0673 # 02 Y:2000 | 02 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $980 | $1,075 | Not Implemented |
TN0673 # 03 Y:2000 | 03 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $715 | $1,820 | Not Implemented |
TN0673 # 04 Y:2000 | 04 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $710 | $0 | Not Implemented |
TN0673 # 05 Y:2000 | 05 | 2000 | USE A RAG RECYCLE SERVICE | $240 | $0 | Not Implemented |
TN0673 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $160 | $0 | Implemented |
NC0180 # 01 Y:1999 | 01 | 1999 | ADJUST BURNERS FOR EFFICIENT OPERATION | $8,324 | $2,000 | Implemented |
NC0180 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,282 | $1,500 | Implemented |
NC0180 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,440 | $53,360 | Implemented |
NC0180 # 04 Y:1999 | 04 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,175 | $3,250 | Implemented |